ZYM Integrated Solutions Customize Your Steel Structure

Home / All / Steel Structure Warehouse /

Iraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospital

Iraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospital

Iraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospital
Iraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospitalIraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospitalIraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospitalIraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospitalIraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospitalIraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospital
CategoriesSteel Structure Warehouse
BrandZYM steel structure building Manufacturer
applicationsteel structure hospital in Iraq
key wordsteel structure building hospital
manufactureChina steel structure factory
steelChina steel structure Q355
installationChina engineer steel structure installation
floors4 layers steel structure hospital
high riseHigh rise steel structure building with elevator
production time30 days
steel structure designfree 3D steel structure design
software3D steel structure frame,tekla,CAD
steel structure Project locatedIRAQ
Unit PriceUS $ 30 / square meter
FOB portQingdao/Shanghai/Tianjin
Terms of PaymentL/C, D/A, T/T
Update TimeSep 8,2024
Detail Information
steel structure buildings
Iraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospital



All the steel structure frame were designed according to clients' site environment:

Wind speed: 30m/s

Earthquack level: 6 Level

Second floor and third floor: 200kg/sqm

https://www.steelstructure-building.com/products2097810/Steel-Structure-Warehouse.htm
This building is a steel structure hospital project in IRAQ.
We make the design ,production,installation to client ,we not only make the production,but also send an steel structure installation engineer to guide.


In order to minimize the cost of customers, we chose  color steel plate for wall panel and roof panel 

However, because the place where the customer is located is a desert place, we choose the epoxy zinc-rich paint 

for steel structure. There is no galvanized steel structure,because the galvanized steel structure is too expensive, and the customer's plant project is not at the seaside, so there is no need to increase the cost of 

the customer.Although the customer requirements are not high, all steel components are thoroughly tested 

by the factory.

The welded welds are very flat and the film thickness is completely up to the customer's anti-corrosion 

requirements.We can make the most expensive steel structure, but we only provide the right one for the 

customer.

steel structure buildings

steel workshop

steel structure building advantages
steel structure building advantages and disadvantages
steel structure apartment building
steel structure of building

Read More 

ZYM After-Sale Service , we will still provide the service after the steel structure installation. 

For further information feel free to contact us