Home / All / Steel Structure Workshop /
2019 Prefabricated Building For Muiti-Storey Steel Warehouse And Workshop
Categories
- Steel Structure Warehouse
- Steel Structure Workshop
- Poultry Steel Structure
- Multi-storey Steel Structure
- School Steel Building
- Hospital Steel Structure
- Hotel Steel Building
- Stadium Steel Structure
- Airport Steel Structure
- Train Station Steel Structure
- Light Steel Villa
- Membrane Structure
- Steel Structure Buildings
2019 Prefabricated Building For Muiti-Storey Steel Warehouse And Workshop
Categories | Steel Structure Workshop |
---|---|
Brand | ZYM steel structure building Manufacturer |
Update Time | Jan 31,2025 |
Detail Information
2019 Prefabricated Building For Muiti-Storey Steel Warehouse And Workshop
We design the internal structure and steel structure appearance,according to customer requirements and
local environment. Steel structure design is in good agreement with the actual working performance of the
steel structure.so the steel structural reliability is high.
The steel structure warehouse has strong wind resistance and can withstand hurricanes of 70 meters per
second.Steel structure is insulated and refractory,so it is durable, the life of prefab building is above 70-100 years.
In the manufacturing process, we use the upper steel material , comes from JINAN AND RIZHAO STEEL plant
group.The toughness of steel is good, making the structure more adaptable to dynamic loads.All steel
components are prefabricated in the factory, assembled on site, with high precision and high degree of
assembly.
The thermal insulation material used is mainly made of glass wool, which has good thermal insulation effect.
With the insulation board of the outer wall, the "cold bridge" phenomenon of the wall is effectively avoided,
and a better heat preservation effect is achieved. The thermal resistance of R15 insulation cotton with a
thickness of about 100mm can be equivalent to a brick wall of 1m thick.
During the construction process, dry work is carried out to reduce the pollution caused by waste to the
environment, and the steel structure material is 100% recycled.
The manufactured components are shipped to the site for installation. The steel structure construction time is
shortened to 30 days.
Read More
ZYM After-Sale Service , we will still provide the service after the steel structure installation.
For further information feel free to contact us
Related Products
subscription
Company
Categories
- Steel Structure Warehouse
- Steel Structure Workshop
- Poultry Steel Structure
- Multi-storey Steel Structure
- School Steel Building
- Hospital Steel Structure
- Hotel Steel Building
- Stadium Steel Structure
- Airport Steel Structure
- Train Station Steel Structure
- Light Steel Villa
- Membrane Structure
- Steel Structure Buildings
Mobile Web