Certificates
Are the steel structure connections site bolted or welded?
Are the steel structure prefabrication workshop connections site bolted or welded?
All site connections are bolted. ,which reduces the site installation time . All parts of the steel structure are
prefabricated in the factory.
All steel structure workshop warehouse frame are welding in Workshop.
All the steel structure workshop warehouse prefabrication buildings are installation on site by bolt.
subscription
Company
Categories
- Steel Structure Warehouse
- Steel Structure Workshop
- Poultry Steel Structure
- Multi-storey Steel Structure
- School Steel Building
- Hospital Steel Structure
- Hotel Steel Building
- Stadium Steel Structure
- Airport Steel Structure
- Train Station Steel Structure
- Light Steel Villa
- Membrane Structure
- Steel Structure Buildings
Mobile Web